Warning of Installate Vertical Mill

2017-04-11

Due to the characteristics of large output and high efficiency, the development of vertical mill is concerned by the majority of ore miners. So, what should we pay attention to when we establish a vertical mill production line?

1 before inspection

After the arrival of the vertical mill, the equipment management department, in conjunction with the purchase of units, the use of units to carry out the inspection, inspection equipment in the transport process, damage, loss, accessories, spare parts. Special tools, technical data, whether with the contract. Packing list in accordance with, and fill out the equipment out of the box inspection form, into the equipment file, if there is a defect and unqualified phenomenon should immediately be to the relevant units to deal with.

2 installation

In accordance with the process equipment layout and installation drawings, basic drawings, equipment outline size and the requirements of each other, such as the layout of the location, the organization of basic construction and equipment handling in place. In the design of vertical mill process layout, the positioning of equipment to consider a variety of factors.

vertical mill

3 daily maintenance

In addition, after the vertical mill is put into operation, we need to do the routine maintenance work of the vertical mill. Replace the wearing parts in time, and does the regular maintenance of the vertical mill. To ensure that the vertical mill can work properly.